Solar system buyer’s guide

How to plan a solar system with battery storage: from working out your consumption and choosing a series to grid connection and maintenance. Step by step, with the most common mistakes to avoid.

Step 1

Decide what you want to achieve

Before choosing equipment, decide what the system is mainly for – it determines the battery size, the type of inverter and how the system is connected.

  • Lower electricity bills – the panels cover daytime consumption and the battery covers evenings and nights. As a prosumer you can feed surplus energy into the grid.
  • Backup power – during a power cut the battery supplies selected appliances: fridge, lighting, pump, boiler, internet.
  • Independence from the grid (off-grid) – for holiday homes and buildings without a connection, where the battery also has to cover cloudy days.
  • Businesses – lower energy and peak-demand costs, reliable power for equipment and refrigeration.
Step 2

Work out your consumption

Your actual consumption is the most reliable figure. Take your electricity bills for the last 12 months and note the monthly consumption in kWh – winter and summer usually differ a lot.

Divide the monthly figure by 30 to get daily consumption. Example: 450 kWh a month is about 15 kWh a day. Also estimate how much of it you use after sunset – that is the part the battery needs to cover.

  • Note your larger loads: heat pump, air conditioners, water heater, electric cooker, EV charger, water pump.
  • If you plan a new large load (a heat pump, an electric car), include it now – sizing the system up front is easier than expanding it later.

Tip: With a dual-tariff meter, your bill shows consumption at the higher and lower tariff separately, which gives a rough idea of when during the day you use energy.

Step 3

Single-phase or three-phase connection

Check which connection your building has – it is stated in the grid connection approval, and an electrician can confirm it. The inverter has to match the connection.

  • Single-phase connection – the BSE series and the single-phase BSR models.
  • Three-phase connection – the three-phase BSR models for homes, the BSC series for businesses and the BSI series for industry.
  • If you have three-phase loads (a heat pump, a well pump, machinery), choose a three-phase inverter.
Step 4

How many panels you need

In Serbia, 1 kWp of solar panels produces roughly 1,100–1,400 kWh a year, depending on location, orientation and roof pitch. If you use 5,000 kWh a year, about 4–5 kWp of panels covers that consumption.

Allow roughly 5 m² of roof per 1 kWp. A south-facing roof at a pitch of about 25–35° is best. An east–west layout produces somewhat less energy, but spreads production more evenly over the day.

  • Avoid shade from chimneys, trees and neighbouring buildings – even partial shade reduces the output of a whole string of panels.
  • Check the condition and load capacity of the roof before mounting. If the roof needs renovating in the next few years, do it before the panels go up.
  • Flat roofs and ground mounting use dedicated frames with a suitable tilt.
Step 5

Choose the battery capacity

Size the battery for what you use after sunset, not for your total daily consumption. If you use about 8 kWh in the evening and overnight, a battery of about 10 kWh is a good choice – it leaves a margin and the battery is never fully drained.

For backup power, add up the power of the appliances that must keep running and multiply by the number of hours you want to cover. Example: 500 W × 10 hours = 5 kWh.

  • Usable capacity is lower than nominal capacity – work with the depth of discharge (DoD) the manufacturer specifies.
  • LiFePO4 batteries are thermally stable and long-lived: Bluesun specifies more than 6,000 cycles at 80% DoD.
  • Modular batteries can be expanded later by adding modules – check in advance how many modules the inverter supports.
  • For off-grid buildings the battery should cover at least one to two days of consumption, or plan a generator as backup for longer cloudy spells.
Step 6

Choose the inverter power

A hybrid inverter manages the panels, the battery and the grid. Its rating should be higher than the largest load you run at the same time.

  • Add up the appliances that run at the same time, for example water heater 2 kW + cooker 3 kW + air conditioner 1 kW = 6 kW.
  • Motors and pumps briefly draw several times their rated power when starting – allow for that.
  • If backup power matters to you, check that the inverter has a backup output and agree which appliances are connected to it.
  • Panel capacity is usually somewhat higher than the inverter rating. That is normal and increases production in the morning, evening and winter.
Step 7

Grid connection and regulations

A system connected to the distribution grid has to be registered and approved. Households and businesses can become prosumers (kupac-proizvođač): they use the energy they produce, feed the surplus into the grid, and it is settled according to the regulations in force.

The process starts with the distribution system operator (Elektrodistribucija Srbije) and covers the application, a check of the technical conditions, installing a bidirectional meter and a contract with the supplier. Conditions, permitted capacity and settlement rules change, so check the current rules before you buy.

  • Do not connect the system to the grid before it is approved.
  • Watch for public calls from local governments and the Ministry of Mining and Energy offering subsidies for solar panels. They can cut the investment considerably, but usually have deadlines and a list of approved installers.
  • An off-grid system with no grid connection skips this process, but the installation still has to meet regulations.
Step 8

Installation and safety

  • Have the system installed by a licensed electrician experienced with solar systems.
  • The system needs proper DC and AC protection, surge protection and earthing.
  • Put the battery in a dry, ventilated room, protected from direct sun, frost and moisture, within the temperature range the manufacturer specifies.
  • Keep cable runs between panels and inverter short, protected from UV and mechanical damage.
  • After installation, ask for the documentation: wiring diagram, equipment specification, warranties and manuals.
Step 9

Maintenance and monitoring

  • Follow production and battery status in the app or on the inverter display. Lower production than in the same period last year is a sign that something should be checked.
  • Clean the panels when needed, with water and a soft brush – no abrasives or pressure washers. In most cases rain does the job.
  • Once a year, have an electrician check the connections, protection and earthing.
  • Update the inverter firmware when the manufacturer releases a new version.

Which series is right for you

A rough recommendation by type of building – the exact choice depends on consumption and connection.

Common mistakes

  • Choosing a system by price rather than by actual consumption.
  • A battery so large it never empties, or so small it is flat by the evening.
  • A single-phase inverter in a building with three-phase loads.
  • Panels in shade, or on a roof that needs renovating soon.
  • Connecting to the grid before the distribution system operator approves it.
  • Separate components that are not matched – a kit with verified compatibility saves time and trouble.
  • No room to expand, even though consumption is expected to grow.

What to prepare for your enquiry

With this information we can suggest a suitable system and prepare a quote.

  • Location of the building (town or municipality)
  • Type of building: house, holiday home, business premises, farm, industry
  • Monthly consumption in kWh for the last 12 months, or your electricity bills
  • Type of connection (single- or three-phase) and approved capacity
  • Goal: lower bills, backup power or off-grid
  • Roof: material, orientation, pitch and approximate area (a photo helps)
  • Large loads you have or are planning
Send an enquiry

Frequently asked questions

Does a solar system work during a power cut?

Only if it has a battery and an inverter with a backup output. A system without a battery shuts down for safety when the grid goes down, so it does not feed voltage into a grid that may be under repair.

How long does a LiFePO4 battery last?

Bluesun specifies more than 6,000 charge and discharge cycles at 80% DoD. At one cycle a day that is more than 15 years of operation; the actual life depends on usage and temperature.

Can I add batteries or panels later?

Yes, if the system is planned for it. Modular batteries are expanded by adding modules, and panels can be added up to the limit the inverter supports. Tell us in advance if you plan to expand.

Do panels work in winter and on cloudy days?

They do, but produce less – several times less in winter than in summer, and considerably less on a cloudy day than on a sunny one. That is why a system is sized for annual consumption, and an off-grid system with a margin.

What is included in a kit?

Kits contain matched panels, a hybrid inverter, a LiFePO4 battery, cabling and a mounting system. The exact contents of each system are listed on its product page.

The figures in this guide are approximate and meant for planning. The right system depends on your building – send an enquiry and we will prepare a proposal for you.